Ecosyms Solutions Pvt. Ltd.

Completed Projects

Project - Main Utility Panel Work @ Umbare Navalakh, Pune

Overview: Ecosyms Solutions Pvt. Ltd. successfully executed the Main Utility Panel Work for Number Solution Pvt. Ltd. at their Umbare Navalakh site in Pune.

The project involved:

  • Design, supply, and installation of the Main Utility Panel
  • Ensuring seamless power distribution and safety compliance
  • Delivering a robust and reliable electrical system tailored to the client’s operational needs

Project - 10 KVA New UPS - Supply, Installation & Successful Commissioning

Overview: Ecosyms Solutions Pvt. Ltd. partnered with JSP Foam (I) Pvt. Ltd. to strengthen their power backup infrastructure by providing a 10 KVA UPS system.

Scope of Work:

  • Supplying a new 10 KVA UPS unit
  • Complete installation and integration with the existing system
  • Testing and successful commissioning to ensure uninterrupted power supply

Project - Upgradation of 125 KVA Rental DG to 250 KVA with New ATS Panel & Power Distribution Network Cabling

Overview: Ecosyms Solutions Pvt. Ltd. successfully executed a major power infrastructure upgrade for JSP Foam at their Talegaon facility.

Scope of Work:

  • Upgraded the existing 125 KVA rental DG set to a 250 KVA system
  • Supplied and installed a new Automatic Transfer Switch (ATS) Panel
  • Designed and implemented the power distribution network cabling
  • Ensured complete system integration and safety compliance

Project - 100 KVA Rental DG-6-Month Deployment

Overview: Ecosyms Solutions Pvt. Ltd. supported JSP Foam at their Navlakh Umbre facility with a 100 KVA rental DG set.

Scope of Work:

  • Supply of a 100 KVA rental DG set
  • Installation and commissioning at client site
  • Ongoing availability and support for the rental duration

Project - 500 KVA Baudouin DG Set-Inspection, Delivery & Installation

Overview: Ecosyms Solutions Pvt. Ltd. successfully supported Siffron, Talegaon in enhancing their backup power infrastructure with a 500 KVA Baudouin DG Set.

Scope of Work:

  • Conducted pre-dispatch inspection of the DG set at Perfect House, Satara
  • Ensured quality checks and compliance before delivery
  • DG set delivered to client site on 23rd July 2025

Project - Transformer Servicing & Component Replacement

Overview: Ecosyms Solutions Pvt. Ltd. carried out comprehensive transformer servicing for DY Patil University at their Ambi campus in Talegaon, Pune.

Scope of Work:

  • Serviced the transformer as per standard maintenance procedures
  • Replaced the damaged LV side bush rod
  • Replaced all gaskets with high-quality ones to prevent leakage

Project - Stadium High Mast Power Cabling-Refurbishment Work

Overview: Ecosyms Solutions Pvt. Ltd. successfully executed the power cabling refurbishment work at the stadium of DY Patil University, Ambi, Talegaon.

Scope of Work:

  • Rearrangement of generator power distribution network
  • Removal of damaged cables
  • Supply and installation of new power cables for the high mast lighting system

Project - Ultratech RMC Plant-Complete Electrical Work

Overview: Ecosyms Solutions Pvt. Ltd. is proud to be associated with Arnam Infra for the upcoming Ultratech RMC Plant at Talegaon.

Scope of Work:

  • Complete electrical design, supply, and installation
  • Installation of panels, cabling, and power distribution network
  • Ensuring safety compliance, reliability, and scalability

Project - Emergency Support-Rental UPS Installation & Failed UPS Collection

Overview: Ecosyms Solutions Pvt. Ltd. provided immediate backup support to Elkay Chemicals at their Bhosari facility.

Scope of Work:

  • Responded promptly to failure of 10 KVA UPS
  • Arranged, installed, and commissioned a rental UPS
  • Collected the failed UPS for further inspection and repair
Completed Projects

Project - CAT DG Set-Pre-Inspection for Servicing

Overview: Ecosyms Solutions Pvt. Ltd. conducted a pre-servicing inspection of a CAT DG Set at IT Park, Baner.

Scope of Work:

  • Detailed health check and inspection
  • Identification of wear, tear, or potential issues
  • Recommendations for smooth servicing

Project - Turnkey Electrical Contracting Work-New Plant

Overview: Ecosyms Solutions Pvt. Ltd. executed turnkey electrical contracting work for Mas Systech’s new plant at Bhamoli, Chakan.

Scope of Work:

  • Supply and installation of Main Power Distribution Panel
  • Complete internal cabling
  • Comprehensive earthing system
  • Lighting design and installation

Project - Annual HT Breaker Servicing

Overview: Ecosyms Solutions Pvt. Ltd. carried out annual servicing of HT breakers at Westin Hotel Business Plaza, Pune.

Scope of Work:

  • Comprehensive inspection and servicing
  • Preventive maintenance
  • System restoration and operational testing

Project - Supply of 500 KVA DG Set-Baudouin Engine with Leroy Somer Alternator

Overview: Ecosyms Solutions Pvt. Ltd. delivered a 500 KVA DG set for Nexus Developers’ Kinara project at Moshi, Pune.

Scope of Work:

  • Supplied a 500 KVA DG set
  • Powered with Baudouin Engine
  • Coupled with Leroy Somer Alternator
  • Delivered and commissioned as per requirements

Project - Refurbishment of APFC Panels

Overview: Ecosyms Solutions Pvt. Ltd. refurbished APFC Panels at Westend Mall, Aundh, Pune.

Scope of Work:

  • Refurbishment of two APFC Panels (850 KVAR & 450 KVAR)
  • Replacement of capacitors, thyristor switches, reactors, APFC relays
  • Miscellaneous spares (indicators, switches, etc.)

Project - Upgradation of Electrical Power Distribution System

Overview: Ecosyms Solutions Pvt. Ltd. upgraded Hyundai Construction’s electrical power system at Chakan.

Scope of Work:

  • Systematic upgrade of distribution infrastructure
  • Replacement and optimization of existing cabling
  • Ensuring safety compliance and reliability

Project - Installation of ESE Type Lightning Protection System

Overview: Ecosyms Solutions Pvt. Ltd. installed a lightning protection system for Golde Automotive (I) Pvt. Ltd. at Chakan.

Scope of Work:

  • Installed an ESE type Lightning Arrestor
  • Provided dedicated earthing
  • Laid copper cabling

Specifications: ATS, Turkey | Protection Area: 107m | Mast Height: 9m


Project - Emergency Power Backup to Furnace - 50 KVA DG Set Installation

Overview: Ecosyms Solutions Pvt. Ltd. provided emergency backup for Trinity Engineering at Chinchwad MIDC.

Scope of Work:

  • Delivered and installed a 50 KVA DG set on 4th July 2024 (Thursday)
  • DG set equipped with an inbuilt double contactor AMF Panel for automatic changeover
  • Low side electrical work currently in progress
  • Final commissioning scheduled soon